PROGRESS OF THE SÓNG PROJECT

The Sóng project is invested by An Gia Group. Boasting a prime location on Thi Sach Street adjacent to Thuy Van Beach, the project gains “spotlight” from every domestic and foreign tourists. This 31,000-square-meter project has 36 airy sea-view upground floors, 2 basements, and a plenty of modern facilities.

Overview of The Sóng project

In 2019, Newtecons assumed the role of Design and Construction General Contractor. By far the Project Site Management Board has been working on the 15th floor structural construction, tiling and plastering up to the 6th floor. To cope with strong sea winds in the stormy season, the Site Management Board outlined a variety of proper solutions that assure the construction progress. The Site Management Board also paid special attention to the safety issues during use of scaffolding, materials gathering and electrical work, so as to ensure workers’ safety.

Construction work to the 15th floor

The Site Management Board and the consultant inspected the tiling and plastering of the 3rd floor

Newtecons, empowered by a robust construction capacity and extensively experienced team, will surely complete project of 5-star standard on schedule.

The Site Management Board is determined to assure the project progress, quality and safety

Share

Related article

30, 08, 2021

CONGRATULATION SITE MANAGEMENT TEAM OF N0.8 – BW THOI HOA PROJECT

21, 08, 2021

CONGRATULATION SITE MANAGEMENT TEAM OF HANOI ADELAIDE SCHOOL PROJECT

11, 07, 2021

NEWTECCONS WON THE BID FOR FLORA MIZUKI MP6-7-8 PROJECT

28, 06, 2021

NEWTECONS WON THE BID – FULBRIGHT UNIVERSITY VIETNAM PROJECT